Concrete Calculator — Cubic Yards, Bags, and Waste for a Slab
Ordering concrete by guesswork is how a Saturday pour stops halfway across the slab. A concrete calculator converts length, width, and thickness into cubic yards for a ready-mix truck, or into bags when the job is small enough to mix yourself.
Slab volume
Measure length and width in feet and thickness in inches. Volume in cubic feet is:
length × width × (thickness ÷ 12)
Divide by 27 to get cubic yards. A 10 by 10 foot pad at 4 inches is about 1.23 cubic yards before waste. Round columns use the cylinder formula: π × radius² × height, with the diameter converted from inches to feet.
Waste, bags, and cost
Add 5–10% for spillage, an uneven base, and forms that are a little wide. The Concrete Calculator applies that percent, then divides by bag yield. A common 80 lb bag is about 0.60 cubic feet; a 60 lb bag is about 0.45. Multiply bags by the price on the pallet for a material total. Ready-mix is sold by the yard, so use the yard figure for a truck and the bag figure only for piers, steps, and patches.
Check the footprint first with the Square Footage Calculator. If the base is gravel, size that layer with the Gravel Calculator before you set forms. Neither number includes labor, rebar, or the short-load fee a plant may charge for a small order.